Basic and detailed design, supply of specialized equipment, technical Assistance during erection, tests, commissioning, training and assisted operation of a new 158,000 m³ gasholder (in progress).
Reform of a water sealed, 3 lifts’ column guided gasholder. The lifts were raised and then lowered after repair by 10 metres, by means of a synchronized jacking system, to permit the repair works, changes of plates and other activities.
Periodic inspections and technical assistance, including the supply of seal components during the maintenance services at the Klonne, MAN and Wiggins gasholders.